This was conceived as a design/build project with the goal of maintaining the supply of nitrogen to users within the building as needed for laboratory work and to facilitate interaction between scientists and support staff. Broadly the scope of work included demolition and removal of the existing Trifecta tank and existing plumbing utilities, gas piping and controls serving the laboratory. GMS designed a new piping solution and installed a new Trifecta nitrogen tank and gas mixers. A new power connection was installed and GMS performed testing and labeling.