Commercial

Underground Leak Repair

In a ditch

Initially the exact location of the underground leak was unknown at the Bladensburg Bus Depot. GMS excavated a trench approximately  20′ long, 8′ deep up to 6′ wide in order to expose the damaged 12” water line. The pipe was cut in order to remove the leaking section and was replaced with around 20’ of … Read more

Installation of Air Handling Units – Commercial Building

York AHUs

GMS provided a solution to replace two existing air handling units with new, more efficient 5-Ton York single stage cooling units with electric heat.  The customer was experiencing uneven heat distribution in the winter and insufficient cooling in the summer along with high electric bills which the new units will help to mitigate.